2027 RULESBuying window closes 31 DecRead the policy briefing →
← Back to news
SolutionsJebel AliDammam2026-11-05

Jebel Ali or Dammam: how many days? The answer is not on the schedule

2026-11-05
Jebel Ali or Dammam: how many days? The answer is not on the schedule

Clients ask how many days to Jebel Ali, and how many to Dammam. We give neither number: we have no measured transit time for these two lanes, and putting a figure in writing amounts to a promise made on a carrier's behalf.

The answer is not on the sailing schedule. Once the vessel has sailed, what decides when a car can be driven away is three stretches after arrival: how long the free storage window is, whether the clearance documents are complete, and how long collection and empty return take. Only the first stretch is public, and the two ports differ widely.

The difference between the two Gulf ports is not sailing time but three stretches after arrival: the free storage window, customs release and collection. DP World's 2022 edition gives imported laden containers 10 calendar days free at Jebel Ali; Mawani's 3rd edition gives only 3 days at Dammam. For the sea leg, follow the carrier's current schedule; this article gives no day count.
✓Imported laden containers at Dammam
Only 3 free days, which forces the documents to be finished before the vessel arrives
✓Imported laden containers at Jebel Ali
10 calendar days, plus 14 and 20 day terms for large shippers
×Booking before the SCoC is issued
Without a valid SCoC ZATCA will not release, and storage starts on day 4
!Projecting Gulf collection dates from East African or South East Asian schedules
Neither schedules nor free storage travel between markets, so the date will be wrong

Two ports, two clocks

PortFree storage, imported ladenHow overstay is chargedVehicles listed separatelyDocument required before arrival
Jebel Ali, DP World 2022 editionFirst 10 calendar daysOne band for days 11–15, a higher band from day 16, one rate each for 20' and 40', OOG charged apartNo dedicated vehicle clause in the tariffMOIAT ECAS/COC
Dammam, Mawani 3rd editionFirst 3 daysThree bands: days 4–10, days 11–15, and from day 16, split by 20' and 40'Not listed; the class for vehicles is not fixedSABER PCoC plus SCoC

Jebel Ali: 10 days sounds generous, but not for cars

The imported laden container table in DP World's 2022 edition runs in four columns: 20', 40', 20' OOG and 40' OOG. The first 10 calendar days are free, days 11–15 are AED 82/164, from day 16 AED 153/306, and OOG runs at roughly three times the standard box. Thirty boxes or more on one bill of lading and one voyage take 14 days, 100 or more take 20. All of it is the container yardstick.

RoRo cars at Jebel Ali move through the vehicle terminal and dedicated yards. A full-text search of the 2022 tariff returns no clause granting imported vehicles free storage per unit. So the 10 days cannot be stretched to cover cars, and cars cannot be claimed to be charged per box either. The honest line is this: the tariff lists no vehicle clause, the free days must be confirmed by the terminal for the period, and the agent should put that confirmation in writing before booking.

The UAE admission step is MOIAT's ECAS/COC, taken before loading, not after arrival. Our Gulf certification article sets out how ECAS differs from SABER; do not prepare the two as one file.

Dammam: 3 days, no room for error

Mawani's 3rd edition gives imported laden containers only the first 3 days: days 4–10 at SAR 350/450, days 11–15 at 400/500, from day 16 at 500/600. Three days means document exchange, duty payment, release and collection must run within a 72-hour order of magnitude, and one missing page costs more than three days.

In the same fee law, general cargo gets 21 days and transit containers 30, but those are other cargo classes. Whether imported vehicles fall under general cargo or under other cargo is not settled by a single sentence of the law, and we do not settle it for them.

Saudi Arabia's hard gate is two SABER certificates: PCoC by model, SCoC by shipment. ZATCA checks both against the invoice, bill of lading and VIN in Fasah, and without a valid SCoC there is no release. One point must be stated plainly: the Saudi authorities are SASO, ZATCA and the SABER platform. Saudi Arabia has no MOIAT. MOIAT is the UAE Ministry of Industry and Advanced Technology. Attributing MOIAT to Saudi Arabia is the most common mistake in this trade, and an agent preparing papers from the wrong list leaves the car sitting in the port.

Free storage does not start on the day you pick up the delivery order. Jebel Ali counts calendar days consecutively, while Dammam's general cargo wording starts from completion of discharge or entry into the customs area. For containers at both ports, the exact start date is whatever the terminal's operating record shows. Before collection, have the agent pull the gate-out time sheet and put the start and end dates on one page.

Four steps after arrival

1
Finish the certificates before loading
Saudi SCoC and UAE ECAS/COC are both taken before loading; leaving them until arrival means waiting
2
Hand the documents to the agent before arrival
Invoice, bill of lading, VIN list and certificate numbers in advance, not on the day of document exchange
3
Book collection for the day of release
Dammam has a 3 day window, so release and collection belong on the same day
4
Keep evidence on the day of exit
Gate-out time sheet, condition photos and odometer reading, all needed later for D&D and claims

Five traps

  • ✓Treating MOIAT as a Saudi body, when it is Emirati; Saudi Arabia uses SASO plus ZATCA plus SABER
  • ✓Treating Jebel Ali's 10 free days as vehicle storage, though the tariff has no vehicle clause
  • ✓Treating Dammam's 3 free days as the carrier's free time, when port and carrier each bill their own
  • ✓Projecting Gulf collection dates from East African or South East Asian schedules
  • ✓Leaving the SCoC until arrival, when storage keeps running and no certificate means re-export

On the tax side, start with the on-site import duty calculator (/en/duty-calculator), read the duty and VAT base, and keep it in a separate column from storage.

Free storage days and rate bands for both ports follow the DP World 2022 edition and the Mawani 3rd edition and may be revised; transit times follow the carrier's current schedule. This reflects the position verified on 5 November 2026; confirm with the terminal and the carrier before booking and collection.

Interested in this car or policy?

Message us on WhatsApp for the latest prices and delivery to your country.

WhatsApp us
WhatsApp us